NBN, 5G and Home Internet
Find the right connection for your new home: what NBN type the address has, when 5G makes sense, how fast you need to go and how to get online on day one.
- Free service: providers pay us, not you
- NBN and 4G/5G home wireless in one call
- We check what’s available at your address first
What Should I Do First When I Move?
Tell us your new address and move-in date. We check which NBN type or wireless coverage reaches it, arrange a plan from our panel and book the connection, free to you.
Sort the internet first, because it is the service most likely to run late. Check what reaches your new address, then choose NBN or home wireless and book it for your move-in date. We can arrange electricity and gas on the same call. Most movers connect electricity and gas together, which means one call and one move-in date.
NBN Co advises contacting a provider more than four weeks before you move, and a home that has never been connected may need a technician visit. 4G and 5G home wireless need no installation, so they can work from day one. To start now, enter your postcode above.
Which Internet Guide Do I Need?
Filter by NBN, wireless or guides, then open one for speeds, set-up times and how to connect.
No internet guides in this group.
Should I Choose NBN or Home Wireless?
NBN is a fixed line and is available at most addresses. Home wireless uses the mobile network and needs no technician, but depends on signal at your address. Check coverage, speed caps and plan terms. We check what is available before you book.
NBN
A fixed-line connection over fibre, copper or cable. You can’t choose the type, because the rollout set it, but you can pick the provider and speed tier. Your modem goes with you and the NBN box stays, so moving your NBN service is a short job.
4G and 5G Home Wireless
Uses the mobile network instead of a line. Plug the modem in and you’re online, with no installation appointment. With strong coverage, 5G can match many NBN plans, and 4G and 5G home internet is checked at your address first.
Apartments and New Builds
Apartment blocks often use fibre to the building, and some new estates and buildings use a private network instead of the NBN. Ask which network the property is on before you choose a plan, and order early for a home that has never been connected.
What Internet Can I Get in My State?
The address decides it more than the state, because NBN Co set the technology for each street. Pick your state for local set-up tips and provider options. In Western Australia and the Northern Territory, contact us and we check the address for you.
Guide to Connect Internet
Work Out What Reaches Your New Address
Before you look at a single plan, find out which technology your new address can use. That one answer decides which speeds you can order, how long set-up takes and whether a technician has to come out.
The quickest check is the NBN Co address checker. Type in the full address, including the unit number if there is one. The result tells you whether the home is ready to connect and which NBN technology serves it.
If the search shows the address isn’t ready, or names a different network, skip down to the section on new estates below, or give us the address and we’ll look into it.
NBN Technology Types in One Line Each
- FTTP: fibre runs all the way into the home, to a connection box on an inside wall.
- FTTC: fibre reaches a pit in the street and a short copper line covers the last few metres.
- FTTN: fibre stops at a cabinet down the street and copper does the rest, so distance matters.
- FTTB: fibre reaches the building’s comms room and the existing wiring carries it to each apartment.
- HFC: uses the coaxial cable first laid for cable TV.
- Fixed wireless: an antenna on your roof talks to a nearby NBN tower.
- Satellite: a roof dish connects homes that other types can’t reach.
Read more: Types of NBN connections explained
Full Fibre Upgrades for Fibre to the Node Homes
NBN Co announced on 3 September 2026 that more than 99% of the roughly 600,000 homes still on fibre to the node can now be upgraded to full fibre, with the program due to finish by December 2030. If the address checker shows an upgrade option, ask your provider to order it, and see how an NBN upgrade to full fibre works before you book.
4G and 5G Home Wireless as an Alternative
Home wireless runs over a mobile network instead of a cable. You plug a modem into the wall and you’re online, with no technician and no connection box. It suits renters, short stays and anyone who needs internet from the first night.
The catch is signal. Speed depends on coverage at your exact address, and even on which room the modem sits in. Check the provider’s coverage map for the new street, then ask what happens if the signal turns out to be weak once you move in.
Because signal decides the result, the 4G and 5G home wireless guide explains how it works at your address and how 4G compares with 5G.
If you are still deciding between a line and the mobile network, the 5G vs NBN comparison weighs speed, coverage, price and reliability, and you can check coverage for the new street before you commit.
Choosing a Speed for Your Household
The right speed comes down to how many people are online at once in the evening, and what they’re doing. Ask yourself three questions:
- How many screens run at the same time? One or two people browsing and streaming need far less than a share house where everyone streams in a different room.
- Does anyone work or study from home? Video calls and large uploads lean on upload speed, which is much lower than download speed on most plans.
- Does anyone game or download big files? Gamers care about a steady connection, and big downloads are where faster tiers pay off.
When you compare, look at the typical evening speed. The ACCC asks providers to show what you can expect between 7pm and 11pm, when the network is busiest.
On copper and fixed wireless connections, the top speed may also be capped by the line itself, so a faster plan won’t always deliver more. To match a plan to those three answers, how to choose the right internet speed works through typical households step by step.
NBN Speed Tiers and Real-World Speeds In 2026
From September 2025, NBN Co lifted its fibre and HFC wholesale tiers: the old 100 Mbps tier now runs at 500, the 250 tier at 750, and a new 2000 Mbps tier sits on top.
Fibre to the node and curb can’t reach these speeds because of the copper, so the connection type still sets your ceiling. Move-in Connect is a free utility connection service for people who are moving.
The ACCC’s final Measuring Broadband Australia report, released on 17 June 2026 using March 2026 data, found NBN fixed-line services delivered 99.4% of plan speed in busy evening hours, with fibre to the node lowest at 94.7%. A quick speed test at your old home shows what your household really uses.
The Order of Jobs Before Moving Day
- Check the address as soon as you know where you’re going and when.
- Decide whether to move your plan or start fresh. Look at your current contract for exit or modem fees before you commit to either.
- Book the connection for your move-in date. NBN Co advises contacting a provider more than four weeks before you move, and a home that has never been connected can need longer. Ask whether a technician visit is needed, and make sure someone will be home for it.
- End the old service the day after you leave, not before, so you’re not offline during the busiest week.
- Pack the modem, power supply and cables in your essentials box rather than the back of the truck.
Moving an existing service, technician visits and the NBN box that stays behind are all part of moving your NBN, which is usually quick once the new address has been checked.
Step two can cost money, because contracts often carry modem or early exit fees, so it pays to read about exit and set-up costs for NBN and internet before you cancel or sign anything new.
Once the address is checked and the date is set, you can connect broadband at your new home by giving us the address and move-in date, and we arrange the plan from our panel.
Renting, Apartments and New Estates
Renting. Ask the agent which technology the property has and where the connection box is. If the set-up needs a new antenna, dish or holes in the wall, get the landlord’s permission in writing before the installer arrives.
Apartments. Some buildings use the NBN, while others have their own private network that only certain providers can sell on. Ask the building manager or owners corporation before you pick a plan. Embedded networks and in-building wiring are explained in internet for apartments, which lists what to check before you sign up.
Moving Into a New Estate or New Build
In a new development, the developer has to arrange the network, and it isn’t always the NBN. Until the network is built and the address is approved, no provider can sell you a service, even if the house is wired. Ask the developer or builder who provides the network and when it will be ready to connect.
New homes on the NBN can also attract a one-off new development charge of $300 including GST, which some providers pass on to you. NBN Co says it doesn’t apply in fixed wireless or satellite areas.
The steps to connect NBN at a new property start with ordering as early as the developer allows. Wondering how long to switch gas and electricity? Our connection timeframes guide covers what to expect.
If the Connection Isn’t Ready on Moving Day
Delays happen, especially at new builds. Ask your provider for a firm date, then cover the gap:
- Use your phone as a hotspot for light browsing, keeping an eye on your data.
- Add a prepaid mobile broadband modem or a 4G/5G home wireless service as a stopgap. Finding a 5G home internet connection takes a coverage check and no installation.
- Ask your provider whether it offers a temporary mobile service while you wait.
Keep a note of every call, date and reference number. If the provider can’t fix things, the Telecommunications Industry Ombudsman handles complaints for free.
If the service arrives but runs slowly or drops out, work through troubleshooting your new internet connection before you call, because most fixes start with the modem position and cabling.
Bundling Internet With Energy
Electricity and gas need sorting for the same date as your internet, so it makes sense to do them together. When you connect electricity at the same time, we can arrange all three in one conversation using your new address and move-in date. For moving home gas, start early, because gas can take longer than electricity.
Some providers sell energy and internet in one package, while others are kept separate. A bundle isn’t automatically cheaper, so compare each part on its own merits. The connect utilities page shows how electricity, gas and internet are set up together for one move-in date. Your energy connection is booked with a retailer from our panel for your move-in date.
Read more about internet at your new home:
In Customers’ Words
5.0 from 48 Google reviews.
“Recommended MoveinConnect to my girlfriend and she said the service was simple and fast, they also found us a better deal for the internet too!”
- ★★★★★
Really smooth experience, only took a 10min conversation to move my electricity, gas and NBN. The agent I worked with was also very knowledgeable and answered all the questions I had thoroughly.
Seth O’Brien · Google review, Aug 2024
- ★★★★★
Move in connect is the most helpful comparison company that I have ever dealt with, the agent jack has helped me save on both my energy and internet, thank u so much
Emaan Ahmad · Google review, Aug 2026
Your Call Goes to Melbourne
Our team at Level 2, 134 Flinders St checks which NBN technology or wireless coverage reaches the address before anything is booked.
Experience You Can Check
Operating since 2017, 5.0 on Google from 48 reviews, ABN 66 168 166 667.
Free, Because Providers Pay
We arrange plans from our panel of providers, not the whole market. The provider pays us a commission and you pay their advertised rates, nothing more. How we’re paid
If Something Goes Wrong
The Telecommunications Industry Ombudsman handles phone and internet complaints for free; the ACCC sets the rules on advertised speeds.
Internet: Questions Movers Ask
How Far Ahead Should I Book My Internet?
NBN Co advises contacting a provider more than four weeks before you move. A home that has never been connected needs more time. 4G and 5G home wireless need no installation, so they can work from day one.
Can I Take My NBN Box to My New House?
No. NBN Co owns the box and it’s registered to that address. Take your modem, router and cables with you instead.
Can I Choose My NBN Connection Type?
No. The rollout decided the type for each address. If the address checker shows a full fibre upgrade, ask your provider to order it. NBN Co says more than 99% of remaining fibre to the node homes are now eligible.
Is 5G Home Internet Faster Than NBN?
Sometimes. With strong coverage, some 5G plans match many NBN plans, but speeds vary with signal. NBN is more widely available and isn’t affected by mobile signal strength.
Can I Get Internet in a Rental?
Yes. Renters sign up like anyone else. If the installation needs new equipment, you may need your landlord’s permission.
What If the NBN Address Checker Doesn’t List My Address?
It may be a new build or still under construction. Ask the developer which network the property uses and when it will be ready, because no provider can sell a service until the network is approved.
What Internet Can I Get in a New Estate?
The developer decides the network, and it isn’t always the NBN. Some estates use a private network with its own providers. Ask the developer who runs it, when it goes live and what the connection charge is.
How Long Does It Take to Get Internet at a New House?
Allow more than four weeks for NBN, as NBN Co advises. A home that has never been connected may need a technician visit. 4G and 5G home wireless need no installation, so they can start once coverage is confirmed.
What If My Internet Isn’t Ready on Moving Day?
Ask your provider for a firm date, then cover the gap with a phone hotspot, a prepaid mobile broadband modem or a 4G or 5G home plan. Keep a note of calls and reference numbers.
What Internet Speed Does My Household Need?
It depends on how many screens run at once, whether anyone works or studies from home, and whether anyone games or downloads large files. Compare typical evening speeds, shown for 7pm to 11pm.
Does Move-in Connect Cost Me Anything?
No. It is free to you because the provider pays us. We arrange plans from our panel of providers and don’t compare every provider in the market.
Moving Soon? Let’s Get You Online
Tell us your new address and move-in date. We’ll check what reaches it, compare our panel and book your internet. Sorting moving home electricity early means the lights are on when you arrive.
