Moving day is hard enough without arriving at your new home to find the lights or hot water are not working. Knowing how to connect electricity and gas before you move can help you avoid delays and last-minute connection problems.
For an existing home, you normally choose an energy retailer, provide your new address and move-in details, and the retailer arranges the connection with the local distributor.
This guide explains what to have ready, whether both fuels can be booked together, how long connections can take, what fees may apply and what changes between states.
Market Overview: Key Insights 2026
- Book early: Energy Made Easy recommends notifying your retailer early once your move-in date is confirmed.
- Smart meters are widespread: AER data shows 60.4% of small electricity customers had smart meters by December 2025.
- Victoria leads: AER data shows about 99.7% of Victorian residential customers have smart meters.
- Book both together: Electricity and gas can be arranged at the same time, but may connect on different days.
- Allow time: Plan for around 1 to 3 business days for electricity and 3 to 5 business days for gas at an established property.
How Do You Connect Electricity and Gas at a New Address?
To connect electricity and gas, choose a retailer for each fuel, give your new address, move-in date and ID, and the retailer asks the local distributor to switch on supply. You do not normally need to contact the distributor yourself.
For an existing property, the process usually looks like this:
- Confirm the full address and your move-in date.
- Choose an electricity and gas retailer.
- Provide your ID and contact details.
- The retailer sends the request to the relevant distributor.
- Check your confirmation and any meter-access instructions.
Your retailer sells the energy, manages the account and sends your bills. The distributor owns the local electricity wires or gas network and handles the physical supply work requested by the retailer.
Booking early is important. Australian Government guidance for movers recommends telling your retailer early once your move-in date is confirmed.

Can You Connect Electricity and Gas at the Same Time?
Yes. Both fuels can be booked in one call or one online form, but each runs on its own meter and distributor, so the power and gas can come on on different days.
The table below shows how the two connections differ.
| Connection Detail | Electricity | Gas |
|---|---|---|
| Who switches it on | Electricity distributor, at the retailer’s request | Gas distributor, at the retailer’s request |
| Identifier | NMI | MIRN in VIC, QLD and SA; DPI in NSW |
| Typical lead time | 1 to 3 business days* | 3 to 5 business days* |
| Site visit needed | Often not where a suitable smart meter is fitted | More often required |
| Can be booked together | Yes | Yes |
*Planning timeframes, not guarantees.
Smart meters can make some electricity processes more flexible because compatible meters can be read remotely. At 31 December 2025, the Australian Energy Regulator reported smart-meter penetration of 61.7% in Queensland, 57.4% in NSW, 59.9% in South Australia and 52.8% in the ACT among small electricity customers.
You can request the same move-in date for electricity and gas, but the two distributors may complete their work at different times.
What Do You Need Before You Book?
You need the full new address, your move-in date, photo ID and contact details. An NMI for electricity and a MIRN or DPI for gas can speed things up but are not essential at an existing home.
To set up electricity and gas at a new address, have these details ready:
- Full property address
- Move-in date
- Account holder’s name
- Photo ID
- Mobile number and email
- Billing details
- NMI, if known
- MIRN or DPI, if known
- Meter-access information
An NMI identifies the electricity connection point. Gas uses a MIRN in Victoria, Queensland and South Australia, while NSW uses a DPI.
If these numbers are unfamiliar, read what an NMI, MIRN or DPI is before booking.
Do not delay an existing-home connection because you cannot find the identifier. The connection team can often locate the supply point from the property address. For the complete preparation list, use the full checklist of details.
How Long Does It Take to Connect Each One?
Electricity at an existing home usually takes one to three business days and gas three to five, while a property that needs a new meter can take up to 20 business days.
Actual timing depends on the distributor, meter, retailer cut-off time, property access and whether additional work is required. Gas may take longer because physical meter access or a site visit can be required.
Victoria is a useful example. The Victorian regulator’s guidance says electricity will usually be reconnected within one business day after you ask a retailer to connect the property.
Timing varies elsewhere, so check connection times by state before relying on a particular move-in date.
What Does It Cost to Connect Electricity and Gas?
Connection fees are set by the local distributor and generally appear on the first bill. Same-day or after-hours requests can cost more, so booking ahead is usually the better approach.
Charges vary by distributor, state, meter and connection type, so check the current connection fees by state rather than relying on a single dollar figure.
The utility connection service itself is free to the customer. Distributor connection or reconnection fees can still apply.
If your move is urgent, check how same-day connections work before relying on an urgent booking.
Is the Process Different in Each State?
The steps are similar in every state, but the distributor, cut-off times and safety requirements can differ.
| State | Electricity Distributors | Gas Identifier |
|---|---|---|
| VIC | CitiPower, Powercor, AusNet, Jemena, United Energy | MIRN |
| NSW | Ausgrid, Endeavour Energy, Essential Energy | DPI |
| QLD | Energex in south-east Queensland, Ergon Energy in regional Queensland | MIRN |
| SA | SA Power Networks | MIRN |
| ACT | Evoenergy | Confirm for the property |
Smart meter coverage is one of the differences between states because compatible meters can make some electricity connections easier to complete remotely.
Why some connections are switched on remotely: share of homes with a smart meter
A working smart meter often lets the distributor switch power on without a site visit. Coverage varies a lot by state, which is one reason timing differs.
| Region | Share with a smart meter |
|---|---|
| Victoria | 99.7% |
| Tasmania | 94.7% |
| Queensland | 61.7% |
| All NECF regions | 60.4% |
| South Australia | 59.9% |
| New South Wales | 57.4% |
| ACT | 52.8% |
Source: Australian Energy Regulator retail performance data, small electricity customers at 31 December 2025. The Victorian figure is the AER-reported share of Victorian residential customers; Victoria sits outside the NECF dataset, so it is shown for comparison.
Victoria is particularly advanced in smart metering, with around 99.7% of Victorian residential customers on a smart meter after the state’s earlier rollout.
For Melbourne VIC, your electricity distributor depends on the property’s location. Read more about connecting energy in Victoria.
Sydney properties may sit in Ausgrid, Endeavour Energy or Essential Energy areas. Brisbane and south-east Queensland are generally served by Energex, while Ergon Energy covers regional Queensland. SA Power Networks distributes electricity in Adelaide and across South Australia.
Daily deadlines also matter, so check the cut-off times by state before relying on a next-business-day or urgent connection.

Who Can Arrange Both Connections for You?
A free utility connection service compares retailers on its panel and can arrange electricity and gas in one process. Arranging both through one service can reduce separate forms and phone calls. You can connect electricity and gas in one call and request both connections for your new address.
Internet can also be included if you want to connect electricity, gas and internet as part of the same move.
Important: A connection service compares retailers on its panel, not every retailer operating in Australia.
Our Melbourne connections team is based at Level 2, 134 Flinders Street, Melbourne VIC 3000. You can find our Melbourne connections team on Google Maps.
Get Your Electricity and Gas Ready Before Moving Day
Connecting electricity and gas comes down to choosing your retailer, having the right details ready and allowing enough time.
Book once your move-in date is confirmed and remember that gas can take longer than electricity. To arrange both as part of your move, speak with Move-in Connect.
Frequently Asked Questions
Do I Need to Connect Electricity and Gas Separately?
No. Both can be booked in one call or online form. They remain separate services with their own meters, so they may be switched on on different days.
Can I Connect Electricity and Gas Before I Move In?
Yes. Book both for your confirmed move-in date as early as possible so there is enough time for the retailer and distributor to process the connection.
Do I Have to Use the Same Retailer for Electricity and Gas?
No. You can choose different retailers. One retailer may mean fewer accounts to manage, but it is not automatically the cheapest option.
Is Someone Needed at the Property for the Connection?
Often not for electricity where a compatible smart meter is fitted. Gas, older meters and some reconnections can require clear meter access or someone at the property.
Does It Cost Anything to Use a Connection Service?
No. The connection service is free to the customer. Distributor connection or reconnection charges may still apply and generally appear on your retailer bill.
Sources and further reading
Where the facts in this energy guide come from.
- Energy Made Easy: Moving house or businessCited in the text above.
- AER: Retail energy market performance update, January–March 2026Cited in the text above.
- Essential Services Commission: Getting electricity connected when movingCited in the text above.
- AER: Key insights from October–December 2025 retail performance data (PDF)Cited in the text above.