Every Move-In and Move-Out
This is the connection moment. A resident moving in on the 14th needs power on the 14th, and gas can take three to five business days to arrange. They can connect electricity and other services in about two minutes, without leaving your move-in checklist.
- Electricity, gas and internet in one journey
- Old address disconnected with a final meter read
- Highest conversion, because residents have to do it anyway
Volume follows tenancy turnover, so this stream stays steady month to month. Residents who need both fuels can arrange electricity and gas together in the same session.
