Mon–Fri 9am–9pm, Sat 11:30am–5pm (AEST)Free connection service 1300 786 045
Free to join · No minimum volume · No exclusivity

Utility Connection Partnership for Developers & Builders

Power, gas and internet on at settlement. Commission on every lot.

Move-in Connect is a free utility connection service for property developers and builders. We connect electricity, gas and internet for each purchaser at settlement, you send one settlement list per stage, and you earn commission on every service connected. It costs your project nothing, with no minimum volume and no exclusivity. Run it alongside your conveyancer partners or sales agents and every purchaser has power on day one.

Send one settlement list Reporting per stage Nothing for you to build

200,000+Australians connected
20+Retailers on the panel
2 daysTypical time to go live
$0Cost to your project
Commission

How Much Can a Settlement Run Earn Your Project?

Our builder referral program pays commission on each electricity, gas and internet service connected for your purchasers, with no cost to your project. Development revenue is project-shaped, so set your real settlement volume below and read the estimate per year and per 100-lot stage.

How it adds up

Paid on Connection, Not on Referral

Commission is earned when a service is successfully connected, not when a purchaser is referred. One purchaser usually connects more than one service, which is why the per-settlement figure is higher than a single-service rate suggests.

  • Itemised per lot, so it reconciles against your settlement schedule and your project accounts
  • Commission is paid monthly, after the retailer confirms each connection
  • Referral commission rates tier up as your annual settlement volume grows
Volume tiers No exclusivity Schedule in writing first
What Assumptions Sit Behind the Estimate?

These are scoping figures to size the opportunity, not a quote, a forecast or a guarantee of earnings. Each sits at the conservative end of what we see, and each can be measured once a first stage runs.

  • Take-up (40%): the share of purchasers who connect through us. Placement drives it: a card in the handover pack and a QR code in the display suite convert better than a line in a settlement letter.
  • Two services per purchaser: most purchasers take electricity plus one other service, usually internet. Estates without reticulated gas (including new Victorian homes that need a planning permit) and buildings on an embedded network will sit lower.
  • $160 per connected purchaser: an estimated average across two services. Actual value varies by retailer, product, state and volume, and improves with scale.
  • Not included: clawback where a connection is later cancelled, and tax. The figures are gross of both.

Your commercial terms, including the commission schedule, are confirmed in writing before you commit to anything.

Where it fits

When in the Handover Do the Connections Happen?

Electricity connection at settlement is the right timing for a new home, because a meter energised too early starts billing a purchaser who has not moved in. We book each lot once its settlement date is firm, and your only step is sending the stage. That is also the point where your settlements team, and your conveyancers, are busiest.

  1. Earlier

    Contract and Construction

    Nothing to do at this stage. We do not contact a purchaser months before a settlement date that may still move, which protects your purchasers from early contact.

    Not yet
  2. Weeks out

    Settlement Date Confirmed

    Once dates firm up, the stage goes on the list and each lot is matched to its NMI (the meter identifier). Gas can take three to five business days, and a new home electricity connection can take up to 20 days if the meter is not yet installed, so this is the right lead time.

    Us
  3. Your stepOne step

    You Send the Stage

    Send the settlement schedule you already produce, or let the QR code in the handover pack do it without you. Your mortgage broker partners and conveyancers will already be working to the same date.

    You
  4. Handover

    Power On at Handover

    Electricity is connected for the settlement date, not three days after it, and status comes back to you per lot.

    Us
Two ways to run it

How Do You Offer It: Handover Pack or Settlement List?

There are two ways to offer Move-in Connect to purchasers: a co-branded card and QR code in the handover pack, or a settlement list you send us. Most projects do both: collateral for purchasers who like to organise things themselves, and a bulk list to catch everyone who doesn't.

Option 1

Handover Pack Card and QR Code

A co-branded card in the settlement pack and a QR code in the display suite, which your sales agents can also hand out (see our real estate agency program). The purchaser scans it, compares retailers for their address and signs up online in about two minutes. Nothing lands on your settlements coordinator.

  • Print-ready artwork carrying your project branding
  • A separate QR code per stage, so you can see which stage converts
  • Live the day you approve the artwork, with no system changes

Best for land estates and house-and-land projects with an engaged purchaser base and a staffed display suite.

Option 2

Send Your Settlement List

The schedule your settlements team already keeps: lot, purchaser, settlement date. Each purchaser gets their own pre-filled link and completes the same journey in their own time. Exports from your property software work as the list.

  • One settlement list per stage, or a standing weekly export
  • Suppression list honoured: flag a lot and nothing is sent
  • Connection status back per lot, reconciled against your schedule

Best for apartments and townhouse stages, and for catching purchasers who never open the handover pack.

Purchaser contact details are usually held under a contract of sale and a privacy collection notice written for the sale, not for onward referral. Confirm with your legal team that your collection notice covers passing details to a connection service before the first list is sent — we supply the wording most developers add. Your conveyancer can usually advise on it.

What changes

What Changes for Your Team and Your Purchasers

For your team

Settlement-Week Utility Calls Stop Landing on Your Team

  • No one chasing energy retailersForty settlements in a fortnight is forty sets of retailer calls your coordinator doesn't make.
  • Fewer day-one defect calls"There's no power" on handover day is a defect call that is not a defect.
  • Referral revenue against a project cost centreItemised per lot, so it can be attributed to the stage that earned it.
  • A free handover inclusionA utility connection service that costs the project nothing to offer, and sits well beside the real estate agency handover.
For your purchaser

Keys and Power On the Same Day

  • 20+ retailers on the panelA comparison for that address across the panel, not one retailer's product handed over.
  • Worked back from the settlement dateGas takes three to five business days, so we plan back from the handover date, not from the request.
  • The old address closed outFinal meter reads arranged, which prevents most post-move billing disputes. Pair it with a booked removalist and moving day is covered.
  • Always optionalIt is never a condition of settlement, and the journey says so on screen.
Worth checking first

Does Your Building Have an Embedded Network?

An embedded network is a private electricity network where a building buys energy in bulk and on-sells it to residents. It is the one thing that changes the answer for an apartment project, so raise it before the first stage settles.

No embedded network

Purchasers Choose Their Own Energy Retailer

This is the standard case for land estates, townhouses and most house-and-land projects. Every purchaser can compare the full retailer panel, every connection is eligible and the estimate above applies as written.

Embedded network in place

Electricity May Be Fixed, but Internet Usually Is Not

Where a building buys energy in bulk and on-sells it, residents may have limited or no retailer choice, so electricity commission may not apply. Internet almost always still does, and so does gas where it is separately metered. Tell us at scoping and we model it honestly. For build-to-rent, the property manager program covers tenant move-ins after settlement.

Embedded network arrangements and a resident's right to choose a retailer are governed by the national energy rules and the Australian Energy Regulator's exemption guidelines, and differ by state and by how the network was authorised. Since 1 July 2026 most exempt sellers must also show their energy ombudsman's details on bills. Confirm the position for your specific building with your energy consultant before relying on any figure on this page.

Reporting

How Is It Reported? By Stage, Not by Month

Partner reporting is broken down by stage and lot, because a monthly total means nothing when three stages are settling at once. It reconciles against the settlement schedule you already run.

  • Lots sent, connected and outstanding, per stage and per lot
  • Take-up by stage, so you can see which handover pack or QR code worked
  • Commission itemised per lot for your project accounting, with exports that suit property software and finance teams

Riverbend — Partner Summary, March

Example monthly partner summary by stage
Example monthly partner summary by stage
StageSettledConnectedEarned
Stage 3 — land4219$3,040
Stage 4 — land3614$2,240
The Quays — apartments289$1,440
Townhomes — release 2177$1,120
Total12349$7,840

39.8% take-up Illustrative figures. Your own numbers will differ.

Before you say yes

Is a Referral Commission on a Sale Disclosable?

Often yes, and it is the first thing your legal team will raise, so the answer is here rather than buried.

Referral Commissions on a Property Sale Are Usually Disclosable

A commission connected to a sale carries disclosure obligations that differ by state, by licence type, and by whether the referral comes from your sales team, your settlements team or an appointed agent. A purchaser must also never be led to believe that using a utility connection service is a condition of settlement.

What we provide: the arrangement in writing with the commission schedule, plus plain-language disclosure wording for a handover pack, a display suite or a settlement email.

What we won't do: sign off on your compliance. Confirm what applies with your legal team, your licensee and your conveyancer before you begin.

Questions

Developer and Builder Partnership Questions

Still have a question?Developer and builder partnership enquiries are answered within one business day.1300 786 045

What Is the Move-in Connect Developer and Builder Partnership?

It is a free utility connection partnership where Move-in Connect connects electricity, gas and internet for your purchasers at settlement and pays you commission on each connected service. You send a settlement list or put a co-branded card in the handover pack, and we do the rest. There is no joining fee, no minimum volume and no exclusivity.

How Much Can a Developer Earn From Utility Connection Commission?

It depends on settlement volume, take-up and services per purchaser. Our scoping model assumes 40% take-up, two services and about $160 per connected purchaser, so 400 settlements a year gives roughly 160 connected purchasers. These are assumptions, not a quote or a guarantee, and your schedule is confirmed in writing first.

How Is the Estimate Calculated?

Settlements a year × the take-up slider gives connected purchasers. Each is assumed to connect two services at an estimated $160 per connected purchaser, and the per-stage figure is the same maths over 100 lots. The full list of assumptions is in the panel above.

When Do You Contact the Purchaser?

We contact the purchaser once the settlement date is firm, not before. Energising a meter early starts billing someone who has not moved in, and contacting a purchaser months before a date that later moves creates complaints. For most projects that means a few weeks of lead time, which also covers the three to five business days gas can take.

How Long Does a New-Home Electricity Connection Take?

It can take up to 20 days when the meter is not yet installed, so confirm the meter with your builder early. Where the meter is in place, a connection can usually be booked for the settlement date. Gas takes three to five business days once booked.

Do New Homes Still Get a Gas Connection?

In Victoria, often not. Since 1 January 2024, new homes, apartment buildings and subdivisions that need a planning permit are being phased off new gas connections. Projects that do not need a permit, and homes with an existing gas connection, are unaffected. Electricity and internet are the core services for Victorian stages, and other states are unchanged.

Can Purchasers Connect Internet and NBN on a New Build?

Yes. We arrange internet connections for new builds alongside electricity and gas, and internet commission usually applies even where electricity does not. The nbn technology at each address sets which plans are available, so we check availability for each lot.

Our Settlement Dates Move Constantly. Does That Break It?

No, because we work from your schedule rather than one fixed date. Send an updated settlement list and the affected lots are rescheduled. Connections booked against a date that moves are rebooked, not cancelled.

What About Builder's Temporary Supply During Construction?

Builder's temporary supply is not covered. It is a different arrangement from a residential retail connection, and this program handles the purchaser's connection at handover. If temporary supply is the problem, say so at scoping and we will tell you plainly whether we can help.

We Are a Volume Builder, Not a Developer. Does This Still Fit?

Yes, and often better. House-and-land handovers are spread across the year rather than clustered in a settlement run, so the volume is steadier and the handover pack is already part of your process. The same two options apply. For build-to-rent stock, the property manager program can sit alongside it.

Can We Offer It as an Inclusion in the Sale?

You can present it as a handover inclusion, since it costs the purchaser nothing, but you cannot make it a condition of settlement or imply the purchaser has to use it. We supply wording that does the first without the second. Confirm what applies with your legal team, licensee and conveyancer.

Does It Work for Apartments on an Embedded Network?

Partly. Electricity commission may not apply where residents cannot choose a retailer, but internet almost always still does, and so does gas where it is separately metered. Tell us at scoping and we will model it on what is actually available in that building.

Do You Need Our Purchasers' Personal Details?

Only for the lots on your list: lot, purchaser and settlement date. Confirm with your legal team that your collection notice covers passing details to a connection service before the first list is sent. We supply the wording most developers add, and a suppression list means a flagged lot is never contacted. Settlement list exports from your property software work as the file.

Can Our Sales Agents Promote It Too?

Yes. Many projects put the same QR code in the display suite so sales agents can offer it, and our real estate agency program works the same way for agents who list your stock. Commission is itemised per lot so it is not paid twice.

What Does It Cost Us?

Nothing. There is no joining fee, no subscription, no minimum volume and no exclusivity, and artwork for the handover pack and display suite is included. We are paid by the retailers on each connection.
Become a partner

Start a Developer Partnership: Tell Us About Your Projects

A partner specialist calls back within one business day to talk through your pipeline. There is nothing to sign to have that conversation.

What Happens After You Enquire?

Three steps, usually completed inside a week.

  1. We call you backWithin one business day to understand your pipeline, stage sizes and settlement pattern.
  2. You get the commission scheduleIn writing, plus disclosure wording for your legal file.
  3. You start on one stageMost partners are live within two business days.
Prefer to talk first?Call the partner team directly.1300 786 045

No obligation. Your details are never sold to third parties.

Thanks — We've Got It.

A partner specialist will be in touch within one business day. If it's urgent, call 1300 786 045.

See other partner types

Your Next Stage Settles Either Way, So Connect It Free

Those purchasers will connect power, gas and internet regardless. Start with one stage, judge the take-up and reporting, and see the other partner types if you also work with agents, brokers or managers.

CallConnect now