Moving into a retirement village or lifestyle community often comes with a long contract but only a short explanation of the power account.
Retirement village electricity may come through the village’s own embedded network or through an ordinary retail meter where the resident chooses a retailer.
This guide explains the two arrangements, what to ask the operator before moving, how concessions and life support should be handled, which services still need separate setup, and how family can help without taking control away from the resident.
Market Overview: Key Insights 2026
- The AER lists retirement villages as a common embedded-network setting, where electricity is bought centrally and on-sold to residents.
- Around 190,000 Victorian customers are supplied through embedded networks. For most residential customers, the Victorian Default Offer acts as the maximum electricity price.
- The AER January-March 2026 update recorded 237,802 life-support electricity customers, equal to 3.4% of customers.
- Life-support registrations rose by 9,084 in one quarter, from 228,718 to 237,802, an increase of about 4.0%.
- The AER finalised revised embedded-network exemption guidelines on 29 August 2025.
Who Supplies Electricity in a Retirement Village?
Many retirement villages and lifestyle communities use an embedded network, where the operator buys electricity for the site and bills residents. Others have ordinary retail meters, where each resident can choose an available retailer.
The first task is to identify which retirement village electricity arrangement applies. With an embedded network, the village operator or its appointed energy company manages the internal network and on-sells electricity.
With an ordinary retail meter, the home operates more like a normal residential address. The AER identifies retirement villages as a common example of embedded networks.
If the contract uses terms such as embedded network, on-selling, exempt seller or a building-wide energy provider, read how embedded networks work before trying to open a separate electricity account.
Key Electricity Customer Figures Relevant to Retirement Village Moves
The chart compares three published customer counts relevant to this guide. The two life-support figures show the increase between December 2025 and March 2026, while the Victorian embedded-network figure provides separate market context.
190,000
228,718
237,802
Embedded network
Victoria
Life support
31 Dec 2025
Life support
31 Mar 2026
Life-support registrations increased in one quarter
The two comparable AER figures rose from 228,718 at 31 December 2025 to 237,802 at 31 March 2026.
+9,084
registrations
about +4.0%
How to read this chart: the first column is a separate Victorian embedded-network customer figure. The second and third columns are directly comparable life-support registration counts and show an increase of 9,084 registrations over the quarter.
| Measure | Customers | Period / scope |
|---|---|---|
| Embedded-network customers | 190,000 | Victoria, recent ESC market data |
| Life-support electricity customers | 228,718 | AER NECF regions, 31 Dec 2025 |
| Life-support electricity customers | 237,802 | AER NECF regions, 31 Mar 2026 |
Sources: Essential Services Commission Victorian Default Offer 2025-26 final decision and AER January-March 2026 retail performance update.
Can Residents Choose Their Own Retailer?
Where the home has its own retail meter, usually yes. In an embedded network, outside retailer choice may exist in principle but can be difficult in practice, so ask the village operator before signing.
For an embedded network retirement village, get the answer in writing. Ask whether the unit has a normal retail meter, whether an outside retailer can access it, and what metering or network charges would apply if you tried to leave the embedded arrangement.
Where the home is separately metered and open to ordinary retail choice, residents can connect electricity for the move-in date in the same way as another established residential property.
For Victorian villages, the Essential Services Commission’s moving guidance says the Victorian Default Offer can act as a maximum-price protection for many residential embedded-network customers.
That does not mean every resident is on the same tariff, so ask the operator to show the rate and how it compares with the current default offer.
A connection service also has a limit here. It can arrange services that are open to its retailer panel, but it cannot override a village’s embedded-network setup.
What Should You Ask the Operator Before Moving In?
Ask who bills electricity, how the rate compares with the regulated default offer, how concessions are applied, how life support is registered and which internet providers can serve the village.
These five questions turn a vague lifestyle village electricity supply clause into practical information you can compare with the contract.
| Question | Why it matters |
|---|---|
| Who bills the electricity? | Shows whether the site uses an embedded network or ordinary retailer |
| How does the rate compare with the default offer? | Gives a regulated benchmark where one applies |
| How are concessions applied? | A concession may need to be re-registered at the new address |
| How is life support registered? | Protection is tied to the premises and responsible energy party |
| Which internet providers serve the village? | Site cabling can limit available technology or providers |
Ask for the answers in writing before the move, not after the first bill. If the contract names an operator or energy seller, keep those contact details with the moving documents so family members do not accidentally call a normal retailer for a service the village controls.
For Sydney NSW, Brisbane QLD or Adelaide SA, regulatory details differ, so use the operator’s written information and the relevant state or national regulator rather than applying Victorian price rules outside Victoria.
How Do Concessions and Life Support Work in a Village?
Concessions and life-support protections can still apply, but the correct contact depends on whether the home has an ordinary retail account or is supplied through an embedded network. Confirm the new-address registration before moving day.
Life support should be handled first. If medical equipment depends on electricity, confirm which retailer, distributor or embedded-network operator holds the registration for the new premises. The guide to life support and moving house explains why registration must follow the person to the new address rather than being assumed to transfer automatically.
Concessions are also linked to the account and eligibility details at the new property. Before the first bill, check energy concessions when you move and ask the village operator or retailer what evidence is required to have the rebate applied correctly.
| Arrangement | Tell | Ask for |
|---|---|---|
| Own retail meter | Retailer and relevant distributor where required | Written confirmation of concession and life-support registration |
| Embedded network | Village operator and any retailer involved | Written confirmation from the responsible operator |
| Not sure | Village operator first | Confirmation of which arrangement applies |
The AER’s January-March 2026 retail-performance data recorded 237,802 electricity customers requiring life-support equipment across its NECF reporting regions, or 3.4% of electricity customers. That was 9,084 more registrations than at 31 December 2025, so confirming the new-address record before moving is an important practical step.
What Still Needs Arranging Separately?
Internet and phone are usually arranged by the resident, and gas may be bottled or separately metered depending on the village. Mail redirection and change-of-address tasks continue as they would for any other move.
A short downsizing utilities checklist is useful:
- confirm whether electricity is embedded or individually metered
- check whether gas exists and whether it is mains or LPG
- arrange internet and phone if they are not supplied by the village
- update postal, banking, medical and government addresses
Internet is often still open to individual choice, although the village’s cabling determines what is technically available. Check internet for the new home before cancelling the old service so there is enough time for any equipment or appointment.
Address changes can easily be missed when family is focused on the move itself. Use a change of address checklist to separate account updates from the physical utility work at the village.
How Can Family Help With the Move?
A family member can help make calls with the resident’s permission. Keep the contract, move-in date, concession details and any medical-equipment information ready, and let the resident confirm identity where the provider requires it.
For moving parents into a retirement village, family can be most useful by organising the information rather than making assumptions. Write down which services are controlled by the village, which are still open to choice, who the account holder will be and which tasks must be completed before move-in day.
For services that are open to ordinary retail choice, residential moving connections can be arranged for the new home while leaving the village-controlled services with the operator.
Before making the call, collect the details in the connection booking checklist so the resident does not need to search for address, identification or meter information during the conversation.
The second retirement village electricity check should happen after the application. Confirm in writing who will send the first bill and, if relevant, who has recorded the concession or life-support registration.
When a family member is helping with the move, keep the resident available to confirm identity or authority, and have the village contract, move-in date, concession details and any life-support information ready before contacting providers.
Our Melbourne connections team is based at Level 2, 134 Flinders Street, Melbourne VIC 3000. You can read reviews of our Melbourne connections team on Google Maps or call 1300 362 580.
Confirm the Power Arrangement Before You Sign
Retirement villages do not all supply electricity the same way. Find out whether the home is on an embedded network or ordinary retail meter, ask how prices and concessions are handled, and make life-support registration a pre-move priority where it applies.
For services that remain open to choice, Move-in Connect can help arrange the move.
Check Which Services Need Arranging Before Move-In
If the new village home still has services you can choose yourself, compare what needs arranging before move-in day.
Frequently Asked Questions
Do I Get an Electricity Bill in a Retirement Village?
Yes. The bill may come from a retailer you choose or from the village’s embedded-network operator, depending on the metering and supply arrangement.
Can I Keep My Current Retailer?
Only if the new home has a compatible retail meter, your current retailer sells at the address and the village arrangement allows ordinary retail supply. Ask the operator before transferring the account.
Does My Pensioner Concession Still Apply?
Eligibility may continue, but the concession usually needs to be correctly recorded for the new address and account. Ask the retailer or village operator what evidence and process apply.
Who Do I Tell About Medical Equipment?
Tell the responsible retailer, distributor or embedded-network operator before moving, depending on how the new home receives electricity. Ask for written confirmation that the new premises is registered.
Can My Son or Daughter Arrange It for Me?
Yes, with permission, although the account holder may still need to confirm identity or authority. Have the resident present for the call or ask the provider what written authority it accepts.
Sources and further reading
Where the facts in this electricity guide come from.
- Essential Services Commission: Victorian Default Offer 2025–26 final decision (PDF)Cited in the text above.
- AER: Retail energy market performance update, January–March 2026Cited in the text above.
- AER: Review of the exemptions framework for embedded networksCited in the text above.
- Essential Services Commission: Getting electricity connected when movingCited in the text above.
Was this guide useful?
Thanks for letting us know.