Mon–Fri 9am–9pm, Sat 11:30am–5pm (AEST)Free connection service 1300 786 045

Moving · Business moving

Does Your New Premises Have Three-Phase Power?

Signing a lease before checking the electrical supply can turn a simple business move into an expensive delay.

Does Your New Premises Have Three-Phase Power?
On This Page
  1. What Is Three-Phase Power?
  2. How Can You Tell If a Premises Has It?
  3. Which Businesses Usually Need Three-Phase?
  4. What If the Premises Only Has Single-Phase?
  5. What Should You Confirm With the Landlord Before Signing?
  6. How Does This Affect Your Electricity Account?
  7. Conclusion
  8. Frequently Asked Questions

Signing a lease before checking the electrical supply can turn a simple business move into an expensive delay. A three phase power check belongs on the pre-lease checklist whenever your equipment needs more than an ordinary office or small-shop load.

This guide explains what three-phase power means, how to verify the supply without touching electrical equipment, which business types commonly need it, and what to put in writing with the landlord before you commit.

The aim is simple: know whether the premises can support the way you plan to trade before the lease is signed, not after the fit-out has started.

Market Overview: Key Insights 2026

What Is Three-Phase Power?

Three-phase power is an electricity supply that delivers power over three active conductors instead of one, allowing premises to run larger motors and more equipment at the same time than a typical single-phase supply.

For a business tenant, the important point in single phase vs three phase is not the electrical theory. It is whether the available supply can carry the load created by your actual equipment. A standard office may need very little; a commercial kitchen, workshop, gym or EV-charging site can need much more.

If you are organising an energy connection for a new premises, account setup and supply capacity are separate questions. The retailer can open the account, but an electrician determines whether the electrical installation suits your equipment.

EV Charger Power Demand

Typical Level 2 chargers use much less power than DC fast chargers. That difference can affect whether a business premises has enough electrical capacity for the planned equipment.

What this shows: a common Level 2 charger may draw up to around 22 kW, while DC fast charging can reach 350 kW. Businesses planning higher-power charging should have a licensed electrician confirm the premises capacity before signing a lease.

Charger type Typical power range
Level 2 EV charger 7–22 kW
DC fast charger 25–350 kW

Source: Australian Government EV charging guidance.

How Can You Tell If a Premises Has It?

Ask the landlord or agent for the supply details, check a previous electricity bill, or have a licensed electrician inspect the switchboard and meter. Do not open a switchboard or remove electrical covers yourself.

Before signing, the checks usually look like this:

  1. Ask for the electrical supply details and any recent electrical documentation before signing.
  2. Look for the NMI and meter information on a recent bill, then confirm the supply with the retailer or electrician.
  3. Have an electrician compare the switchboard and available capacity with your equipment list, especially where motors, commercial cooking or charging equipment are planned.

A three phase power check is much more useful before fit-out quotes are finalised. If you are also trying to understand the metering side, the guide to how your electricity meter works explains what the meter records and why the NMI matters when an account is opened.

Which Businesses Usually Need Three-Phase?

Commercial kitchens, machinery workshops, sites with large air-conditioning loads and businesses planning fast EV charging are among the premises most likely to need three-phase. Offices and small shops often do not, but an electrician should decide from the actual equipment list.

Business type Three-phase usually needed? Why it matters
Small office Usually no Computers, lighting and standard office equipment generally have modest loads.
Retail shop Usually no Standard lighting, refrigeration and POS equipment may fit within single-phase, depending on total load.
Café or restaurant Often Commercial ovens, coffee machines, dishwashers and refrigeration can create a high combined load.
Workshop / light manufacturing Usually Motors, welders, compressors and machinery often need higher-capacity supply.
Gym / large air-conditioning load Often Large HVAC, saunas and other equipment can increase peak demand.
Site with fast EV charging Usually Higher-power charging can require substantial electrical capacity; an electrician must confirm.

Hospitality operators have several services to coordinate at once, so the guide to utilities for a new café or restaurant is useful when gas, internet, EFTPOS and a high-load commercial kitchen all need to be ready for opening day.

Annual consumption also affects whether a business is treated as a small or large energy customer. The separate guide to small vs large business energy customers explains why usage classification can matter after a move to larger premises.

What If the Premises Only Has Single-Phase?

A three phase upgrade is arranged through a licensed electrician and the local distributor, not through the electricity retailer. The work can involve design, approvals, metering and physical changes, so get a written scope, cost and timeframe before signing the lease.

Victorian distributor Jemena explains that changes to an existing connection are handled as an alteration, not as ordinary account setup. Its guidance on connection alterations is a useful example of why an upgrade needs technical and network approval rather than a simple retail request.

Because the distributor depends on the property location, check who your electricity distributor is before asking for upgrade requirements. A retailer can still arrange the business electricity account, but it does not build extra network capacity.

What Should You Confirm With the Landlord Before Signing?

Confirm the supply type and capacity in writing, who pays for any upgrade, whether the meter is separately assigned to your tenancy, and whether previous tenants operated equipment with a similar electrical load.

Confirm in writing Why it matters
Supply type and available capacity Shows whether the planned equipment can operate without an upgrade.
Who pays for any upgrade Avoids a dispute after the lease is signed and fit-out costs are committed.
Whether your tenancy has a separate meter Affects retailer choice, billing and how the account is opened.
What previous tenants operated Useful context for likely load, but not a substitute for an electrician’s assessment.

South Australia’s distributor also treats changes to a business connection as a specific network process. SA Power Networks’ business connection guidance reinforces why the lease should deal with upgrade responsibility before money is committed to fit-out work.

Once the supply question is settled, you can compare and connect electricity for your business with a clearer idea of the premises, the meter and the expected annual usage.

How Does This Affect Your Electricity Account?

The retail account is opened much the same way whether the premises is single-phase or three-phase, but the meter configuration, tariff options and expected consumption can differ. Give the retailer the NMI and accurate business details when the account is opened.

A sensible three phase power check therefore happens before the electricity account is treated as the final step. If the physical supply needs work, resolve that with the landlord, electrician and distributor first; then use the business moving service to coordinate the account start with the move-in date.

For the complete account checklist, including the ABN, authorised contact, lease start date and meter identifiers, use the guide to setting up electricity at new business premises.

For Melbourne VIC enquiries, our office is at Level 2, 134 Flinders Street, Melbourne VIC 3000. You can view our Melbourne office on Google Maps or call 1300 362 580 before the move if the account details need to be coordinated with other utilities.

Practical tip: give the electrician a complete equipment schedule rather than a rough description such as “commercial kitchen” or “workshop”. List the rated power of ovens, coffee machines, compressors, welders, HVAC systems, lifts, refrigeration and chargers that may run at the same time.

Do not treat a previous tenant’s successful operation as proof that your own fit-out will be suitable. Two cafés can have very different electrical loads, and a retail tenancy can change dramatically when refrigeration, air-conditioning or EV charging is added. The safest leasing decision is based on the equipment you intend to install, the supply that actually exists and written responsibility for any required upgrade.

Conclusion

Three-phase power is easy to check before you sign and much harder to solve after fit-out starts. Ask the landlord, review the available records and have an electrician confirm the load. When the premises is suitable, Move-in Connect can help arrange the business utilities.

Frequently Asked Questions

How Do I Know If I Have Three-Phase Power?

Ask the landlord, check a previous bill, or have a licensed electrician inspect the switchboard and meter. An electrician should confirm the supply against your equipment list.

Do Offices Need Three-Phase Power?

Usually not. Standard office equipment often operates on single-phase, although large HVAC, server rooms, EV charging or unusual equipment can change the requirement.

Who Pays for a Three-Phase Upgrade?

That depends on the lease and the agreement with the landlord. Confirm responsibility, scope and cost in writing before signing.

Does Three-Phase Cost More to Connect?

Opening the retail account is similar, but metering, tariffs and any physical upgrade can differ. Ask the retailer about the account and an electrician or distributor about supply work.

Can a Retailer Upgrade My Supply?

No. A retailer opens the energy account. Physical supply upgrades are arranged through a licensed electrician and the local electricity distributor.

Sources and further reading

Where the facts in this business moving guide come from.

  1. energy.gov.au: Electric vehicle charging equipmentCited in the text above.
  2. DCCEEW: Accelerating EV Charging programCited in the text above.
  3. energy.gov.au: Register to host public EV chargersCited in the text above.
  4. ABS: Building approvals, Australia, June 2026Cited in the text above.
  5. Clean Energy Council: Rooftop solar and storage report, January–June 2026Cited in the text above.
  6. Jemena: Connection alterations FAQsCited in the text above.
  7. SA Power Networks: Modify your business connectionCited in the text above.

Was this guide useful?

CallConnect now